Update, April 2007
I thought I would sit down and write you and update on the cabin . We had our combo inspection last week and everything went really well. We made some decisions that helped us to move along a little faster.
We hired the plumbing and electrecal out. Roger didn't want to have to deal with figuring out stink pipe issues and things like that so we had it done. We got a fairly good price and it was well worth it to me for him not to have the headaches and worry.
We also decided to add central ac and heat and had that installed. It was also a good quote and I'm sure it is something we will really appreciate down the road especially in the summer.
Since the inspection we started sheeting the walls. We have ordered the tile for the kitchen and the cabinets as well. We already have the vanities for the powder room and upstairs bath. I haven't been able to find one for the master bath that I really like because of the odd size it has to be. I found one that is 48" that I really liked but I didn't want to pay $2,400 for it without seeing it in person. I showed a picture of it to Bill down the road and he says he and Roger can build it for a fraction of the cost and probably out of better materials.
We are hoping to be done by August it should be close. It is exciting getting all the fixtures and to make sure everything matches and since I'm no interior decorator it can be a challenge, but we are enjoying it all the same.
- Laura |